Portfolio of past projects

Top Specialists

Quality Workmanship

Professional Service

Details of our past projects


Newham College’s Dorothy Garrod Building

Newham College’s Dorothy Garrod Building

The Dorothy Garrod Building brings together teaching, research, conference and social space downstairs, with outstanding student accommodation on the upper two floors, all topped by a roof garden with a glass gym and meeting space.

More Information

Main Contractor: SDC Builders

Architect: Walters & Cohen

Requirement: 1746m2 of glazing consisting of Schuco windows, doors & curtain walling.

Solution: Schuco FWS50 curtain walling profiles utilising the NCM detail where the double glazed units will be bonded back to framework, Schuco AWS/ADS 70.HI Windows & Doors, Glass: 10mm Pilkington Toughened Suncool 70/35 & 10mm Pilkington Toughened Optifloat Clear.

Value: £1.5M

Civil Engineering Building, Cambridge

Civil Engineering Building, Cambridge

To accommodate the predicted rate of expansion of the number of Academics and Students, the University of Cambridge, Department Of Engineering will reintegrate its’ entire operation on the West Cambridge site in a phased development over the next 10-15 years.

More Information

Main Contractor: SDC Builders

Architect: RHP

Requirement: Hardwood Composite Timber Aluminium Curtain Walling, Doors & Windows, Facade & Fins.

Solution: Wicona Wictec 50A Aluminium / Timber Curtain Walling, Wicona Wictline 75 Evo Window System, Wicona Wicstyle 75 Door System Façade incorporating projecting glass fins (thermochromic), Automatic doors to entrance, Glass: 13.5mm Pilkington heat strengthened Optiphon Suncool 70/40 Pro T laminate & 10mm Pilkington Toughened heat soak tested Optifloat Clear, Fins: 21.5mm Clear Low Iron Laminated Glass with Suntuitive Thermochromic Interlayer.

Value: £2.5M

The Chimes, Westminster, London

The Chimes, Westminster, London

The building, formerly Grenadier House and now The Chimes, had formerly been government offices and was used by the Ministry of Justice since its construction in 1989.
The Chimes scheme provides 36 assisted living flats on six floors together with communal kitchen-café, storage areas, wellness centre/spa, guest accommodation, and apartments for staff.

More Information

Main Contractor: Pegasus Life

Managment Contractor: ISG

Architect: MAE

Requirement: Schuco Curtain walling, windows and doors, Bespoke grilles, balustrades & copings, Weather louvres.

Solution: Aluminium Curtain Wall System: Schuco FW50+, Steel Curtain Wall System: Schuco Jansen VISS Fire 60/60, Steel Door System: Schuco Jansen Janisol C4, Windows Ventilation System: Schuco AWS VV, Aluminium Door System: Schuco ADS 75, Glass: 10mm & 6mm toughened, heat soaked (low Iron) incorporating Optitherm S1 Plus with arrised edges & 9.1mm annealed laminated (low Iron) incorporating acoustic interlayer and Optitherm S1 plus.

Value: £5.0M

Lambeth Palace Library, London

Lambeth Palace Library, London

Lambeth Palace Library contains an unrivalled collection of precious books and manuscripts, documenting over 1000 years of ecclesiastical and cultural life of the Church and Great Britain.
The new library building will preserve the most important religious collection outside the Vatican – the collections include more than 5,000 volumes of manuscripts and over 200,000 printed books.

More Information

Main Contractor: Knight Harwood

Architect: Wright & Wright

Requirement: External Envelope

Solution: Capped Curtain Wall System: Schuco FW60+ SG and FWS60, Windows & Doors: Schuco AWS/ADS 75.SI Profiles, Glass: 8mm Pilkington Toughened Suncool 30/16 Pro T, 6mm Pilkington Toughened Suncool 40/22 Pro T, 6mm Pilkington Toughened Optitherm S1 Plus, 10mm Pilkington Toughened Suncool 30/16 Pro T with Machine Ground Edges & 6mm Pilkington Toughened Optifloat Clear.

Value: £1.5M

The Amenities Building, Cambridge

The Amenities Building, Cambridge

Vinci Construction have appointed Prism Architectural as the specialist Sub-Contractor to provide the external envelope for The Amenities Building on the Granta Park redevelopment site on the outskirts of Cambridge.

The Amenities Building provides the science, technology and biopharmaceutical park with a central and accessible leisure facility and pool for its clients and their staff.

More Information

Main Contractor: Vinci Construction

Architect: Gensler

Requirement: Wicona Aluminium Curtain Walling, Windows and Doors, Rainscreen, Cladding, SFS and Vertical Fins.

Solution: Wicona Wictec 50, Wicona Wicline 65 EVO, Wicona Wicstyle 65, Cladding: 3mm Vitrabond, SFS: 150mm Albion, Fins: Bespoke Extrusions, Glass: 8mm Heat Soak Toughened Ipasol 62/29 Ultraselect & 10mm Heat Soak Toughened Optifloat Clear.

Value: £2.0M

Honeybourne Place, Cheltenham

Honeybourne Place, Cheltenham

Barnwood Construction teamed up Britplas again for their latest construction project, this time a 63,000 sq ft Grade A office block in Cheltenham.

This £12m development, in the heart of Cheltenham, was designed by Roberts Limbrick Architects and provides some 63,000 sq ft of office space over five floors. The external envelope was designed, manufactured and installed by Britplas and features a complicated façade consisting of several different types of cladding in addition to curtain walling.

Materials used include aluminium rainscreen, composite cladding, stone cladding, ceramic cladding and brick slip Corium cladding, along with Schüco curtain walling FW60 + SG, Schüco FW60 and Smart Wall external doors. The building has been finished to the highest standards and is an impressive addition to our commercial portfolio.

More Information

Our Client: Formal Investments Limited

Main Contractor: Barnwood Construction

Sector: Commercial

Products: Aluminium Schüco curtain walling FW60 + SG, Schüco FW60 and Smart Wall external doors, aluminium rainscreen, composite cladding, stone cladding, ceramic cladding and brick slip Corium cladding

Value: £3.5m

Woodberry Down Block D

Woodberry Down Block D

The refined curtain wall and windows building façade connect and create a balance with the
undulations of the vertical metallic exterior – in striking tones of warm and cool gold

More Information

Our Client: Prater Limited

Main Contractor: Berkeley Homes

 

Marriott London City Airport

Marriott London City Airport

The facade of the building consists of natural limestone recessed window bays,
GRC columns at the main entrance and aluminium soffits

More Information

Our Client: Gale-Construction

Main Contractor: RG-Group

 

Battersea Power Station Apple HQ

Battersea Power Station

Battersea Power Station, a former coal-fired plant, is located on the south bank of the River Thames in southwest central London. We are proud to be part of this prestigious and iconic project and deliver the glass installation to the Main Entrance doors and Lift Shaft for Apple HQ.

More Information

Our Client: VisionArch

Main Contractor: ISG

 

55-93 Knightsbridge

55-93 Kinightsbridge

This mixed-use development is situated in the heart of Knightsbridge, London SW1. The existing Grade II listed building has been extensively redeveloped featuring the retention of the original 120 m long facade dating from 1905, which forms part of the local conservation area, with a complete rebuild and isolation of the building behind.     The development also incorporated multiple construction types and complex interfaces in relation to both historic and new-build elements.

The Janisol Arte 2.0 renovation window system was employed throughout to make the slim line heritage windows.

More Information

Our Client: Sir Robert McAlpine

 

1-4 Marble Arch

1-4 Marble Arch

Using the steel Jansen VISS SG (structural glazing) system the project has seen the existing façade retained, while behind it a full demolition and rebuild has taken place, creating three floors of retail space and a further seven floors of high quality Category A offices.

In place of the old internal structure a new structural steel frame, rising from the sub-basement to the roof contains 123,766 sqft of space over 11 storeys, including three floors for retail areas and seven floors of commercial office space.

These facade alterations are intended to be subtle and in harmony with the existing building’s design. The fenestration to the lower levels is expanded within the stone facade, linking the ground and first floors. New shopfronts are designed as elegant insertions into the existing facade with profiled bronze-coloured metal surrounds and carefully enhanced stone detailing.

More Information

Our Client: Propak Architectural Glazing Ltd

Main Contractor: Galliford Try

 